52-week curriculum

Each week has one claim lesson as its spine and two to four supporting lessons. Quarter 3 is split into blocks for data centres, tunnels and railways, ports and offshore, and buildings and infrastructure. This is a draft; the order may change.

Go to the academy topic index

Quarter 1 · Weeks 1–13 · Foundations: contract, building the programme, records

Week 1
  • L01 The DNA of a Claim
  • FDC01 The FIDIC family and risk allocation
  • SAH01 Why records? "No record, no event" in claims and payments
  • TB-00 Opening: the match sheet
Week 2
  • L02 Possession, Access, Ground and Piling Risk
  • FDC02 Parties, the Engineer's role and notice rules
  • SAH02 The daily site report: weather, crews and plant, work done, obstructions, visitors
Week 3
  • L03 Contract Map, Document Priority and Authority
  • FDC03 Programme, progress and the extension-of-time mechanism
  • PLN01 Work breakdown structure and activity definition (WBS, durations, calendars)
Week 4
  • L04 Tender Assumptions, Qualifications and Clarifications
  • PLN02 Logic links, lag/lead and constraints
  • P6T-01 XER file structure and project selection
Week 5
  • L05 Notice to Proceed, Permits and Mobilisation
  • PLN03 Critical path and float (total/free)
  • P6T-02 Calendars, work hours and duration units
Week 6
  • L06 A Workable Baseline Programme
  • PLN04 Resource- and cost-loaded baseline
  • P6T-03 WBS and L2/L3/L4 programme levels
  • TB-01 The lost first programme: the baseline
Week 7
  • L07 Calendars, Logic and Milestones
  • PLN05 Programme quality check (DCMA 14-point logic)
  • P6T-04 Relationship types (FS/SS/FF/SF) and lag
Week 8
  • L08 Total Float, Free Float and Milestones
  • P6T-05 Forward/backward pass, float and critical path
  • TB-02 Total float, free float and milestone behaviour
Week 9
  • L09 Employer Data and Design Responsibility
  • FDC04 Variations, measurement and valuation
  • P6T-06 Constraints and the DCMA hard-constraint check
Week 10
  • L10 Performance Obligations and Design Standards
  • SAH03 Photo and evidence standards: date/location, before–after, naming
  • P6T-07 Progress entry: percent, actual dates, remaining duration
Week 11
  • L11 The Submittal Completeness Gate
  • SAH04 Correspondence and notice discipline, reference numbers, deadlines
  • PLN06 Importing an XER into The-SiteTeam, saving a baseline, submission and approval
  • FDC06 Claims and disputes; tracking in The-SiteTeam
Week 12
  • L12 Approval Delay and Decision-Ready Submissions
  • SAH05 Site forms and inspection: question types, records of inspection, document register
  • FDC05 Payments: interim statements, payment certificates, retention
  • P6T-08 XER export and the round trip to P6
Week 13Case week
  • L13 Long-Lead Procurement and Vendor Data
  • SAH06 Site reports, forms, correspondence, mail commands and the document register in The-SiteTeam
  • SAH07 Case: tender Q&A discipline (Nota van Inlichtingen, Spørsmål og svar, ProjNet Q&A) and the RFI register
  • FDC07 Case: Europe's standard contracts versus FIDIC (NS 8407, ABT18, UAV-GC, YSE 1998, US FAR)
  • PLN07 Case: an 18-month programme from a German school tender (GU)

Quarter 2 · Weeks 14–26 · Practice: variations, updates, payment

Week 14
  • L14 Trade Interfaces and Builder’s Work
  • MSP01 Project setup, calendars and working hours
  • PLN-01 BOQ reading wizard and column mapping
Week 15
  • L15 Instructions, RFI Replies and Constructive Change
  • MSP02 Task structure, WBS and summary tasks, duration types and effort-driven scheduling
  • PLN-02 L2/L3/L4 by discipline and area breakdown
  • HKD01 Contract types and payment mechanisms
Week 16
  • L16 Notice Regimes, Time Bars and Actual Knowledge
  • MSP03 Links, lag/lead, constraints and deadlines
  • PLN-03 Productivity, crew cap and labour assumption
Week 17
  • L17 Variation Valuation and Daywork
  • HKD04 Change management and new unit rates
  • MSP04 Resources, cost, levelling and overallocation
  • PLN-04 L5 work steps and progress measurement
Week 18
  • L18 Daily Records and Evidence Architecture
  • UPD01 Data date and the update cycle
  • MSP05 Baseline, progress entry, earned value fields (BCWS/BCWP/ACWP) and reports
Week 19
  • L19 Progress Measurement and Programme Updates
  • UPD02 Progress measurement methods
  • UPD03 Actual dates, remaining duration and out-of-sequence progress
  • TB-03 Progress measurement and programme updates
Week 20
  • L20 Delay Events, Critical Path and EOT
  • UPD04 Baseline versus current programme: detecting delay and the S-curve
  • MSP06 Moving data between Microsoft Project and P6/XER (MPP/XML ↔ XER)
  • PLN-09 From the programme to notice and EOT evidence
Week 21
  • L21 Concurrency and Responsibility Windows
  • EVM01 Budget, cost breakdown and control accounts
  • PLN-05 Tender programme from a German LV (GAEB X83)
  • TB-04 Concurrent delay and responsibility windows
Week 22
  • L22 Mitigation, Resequencing and Acceleration
  • EVM02 PV, EV and AC
  • EVM03 Variances and indices (SV, CV, SPI, CPI)
  • PLN-06 Basis of schedule (K5) and justified warnings
Week 23
  • L23 Payment Notices, Set-Off and Retention
  • HKD02 Preparing an interim payment: measurement, stage percentages and deductions
  • HKD03 Price adjustment and escalation
  • EVM04 Forecasts (EAC methods, ETC, VAC, TCPI)
Week 24
  • L24 Payment Bonds, Performance Bonds and Subcontract Recovery
  • HKD05 Subcontractor payments, purchase orders and the final account
  • EVM05 Commitments, procurement and cash flow
  • PLN-07 Facade package: fabrication, procurement and installation sequence
Week 25Case week
  • L25 Semester I Integrated Case Workshop
  • UPD05 Structure of the monthly progress report
  • UPD06 Updating, the report screen and distribution in The-SiteTeam
  • HKD06 Payments, cost visibility, procurement and subcontractor documents in The-SiteTeam
  • EVM06 EVM, S-curve and cost visibility in The-SiteTeam
Week 26Midterm
  • UPD07 Case: a Smithsonian 2 MW solar design-build, from tender programme to monthly update
  • HKD07 Case: a Danish ABT18 technical building and a Dutch termijnstaat payment plan
  • EVM07 Case: budget and earned value on a US federal design-build canopy job
  • MSP07 Case: building the same small project in Microsoft Project and The-SiteTeam, with a DCMA check
  • PLN-08 Monthly report: planned / actual / forecast
  • PLN-10 Document control with ISO 19650: from drawing to claim evidence

Quarter 3 · Weeks 27–39 · Sector blocks and delay analysis

Week 27Data centres
  • L26 Selecting the Delay Analysis Method
  • P6I-01 Large master XER: multiple calendars, LOE and WBS summaries
  • DC-1 Data-centre programme: L1–L5 commissioning and handover (in preparation)
Week 28Data centres
  • L27 As-Planned versus As-Built and Windows
  • P6I-07 Engineering/procurement hold (EP) and expediting
  • TB-05 As-planned versus as-built and windows
  • DC-2 Long-lead equipment: generators, UPS, chillers (in preparation)
Week 29Data centres
  • L28 Time Impact Analysis and Fragnet Design
  • P6I-02 K1–K5 rule check and basis of schedule
  • EVM-01 Cost-loaded programme: BAC from BOQ amounts
  • DC-3 Delay to the integrated systems test (IST) (in preparation)
Week 30Data centres
  • L29 As-Built Critical Path and Collapsed As-Built
  • P6I-03 Driving chain and acceleration ideas
  • TB-06 As-built critical path and collapsed as-built
  • DC-4 Case: a delay file on an MEP-heavy project (in preparation)
Week 31Tunnels, roads and railways
  • L30 Programme Quality, Out-of-Sequence Progress and Manipulation
  • P6I-04 Embedded DCMA 14 check: thresholds and fixes
  • TB-07 Programme quality, out-of-sequence progress and critique of analysis quality
  • TN-1 TBM/NATM progress and linear schedules (LOB) (in preparation)
Week 32Tunnels, roads and railways
  • L31 Disruption, Productivity and the Measured Mile
  • P6I-05 Baselines inside the XER and the variance table
  • EVM-02 Freezing the baseline
  • TN-2 Differing ground and rings-per-day productivity (in preparation)
Week 33Tunnels, roads and railways
  • L32 Prolongation and Event-Based Cost
  • P6I-06 Crew continuity levelling (K2)
  • EVM-03 PV, EV, AC and the S-curve
  • TN-3 Land acquisition, site possession and prolongation cost (in preparation)
Week 34Ports, shipyards and offshore
  • L33 Home Office Overhead and Eichleay
  • P6I-08 Comparing two XERs: planned, actual, forecast
  • EVM-04 SV/CV and SPI/CPI
  • LM-1 Marine works: weather windows and standby (in preparation)
Week 35Ports, shipyards and offshore
  • L34 Global Claims and Responsible-Cause Deduction
  • P6I-09 Programme and XER output from GAEB X83
  • EVM-05 EAC, ETC, VAC and TCPI methods
  • LM-2 Heavy lifts and marine spread cost (in preparation)
Week 36Ports, shipyards and offshore
  • L35 Total Cost and Modified Total Cost
  • EVM-06 Earned schedule: ES, SPI(t), forecast finish
  • EVM-07 Progress payments and cash flow
  • LM-3 Shipyard/offshore: block fabrication and change (in preparation)
Week 37Buildings and infrastructure
  • L36 Expert Independence and Report Architecture
  • BIM01 What is IFC? Model structure, classes, property sets and base quantities
  • BIM02 Quantities from the model: mapping templates, exclusions, units and base-quantity warnings
  • TB-08 Expert independence and report architecture
  • BN-1 Buildings: the façade package and interface claims (in preparation)
Week 38Buildings and infrastructure
  • L37 Cross-Examining the Delay Expert
  • BIM03 BOQ structure and unit rates: pricing from a price list
  • BIM04 Comparing model revisions
  • TB-09 Cross-examining the delay expert
  • BN-2 Infrastructure: existing utilities, excavation and diversions (in preparation)
Week 39Buildings and infrastructureCase week
  • L38 Cross-Examining the Quantum Expert
  • BIM05 Managing coordination issues with BCF
  • BIM06 BOQ revision comparison, cost impact and GAEB exchange
  • BIM07 Case: from a GAEB bill to a BOQ and a revision comparison
  • EVM-08 Period comparison and approved periods
  • BN-3 Case: an integrated building and infrastructure file (in preparation)

Quarter 4 · Weeks 40–52 · Completion, disputes and final exam

Week 40
  • L39 Quality, ITP, NCR and Defect Management
  • RSK01 Risk versus uncertainty; the risk register
  • AIP-01 What is AI and what is not: engine and Gemini surfaces
Week 41
  • L40 Testing, Commissioning and System Boundaries
  • RSK02 Probability-impact matrix and heat map
  • AIP-02 Rule-based programme from the BOQ and lessons learned
Week 42
  • L41 Completion, Punch Lists and Practical Completion
  • RSK03 Duration uncertainty: three-point estimates and distributions
  • AIP-03 Reading contract clauses: rule table + Gemini
Week 43
  • L42 Partial Possession, Sectional Completion and LD
  • RSK04 Monte Carlo simulation, P50/P80, sensitivity and merge bias
  • AIP-04 Reading a scanned contract page
  • PBI-01 What Power BI does and does not do: loading the pack
Week 44
  • L43 Suspension, Default and Cure
  • RSK05 Interpreting results, contingency and risk actions
  • AIP-05 Correspondence classification and RACI assignment
  • PBI-02 The model: tables, relationships and several projects
Week 45
  • L44 Termination and Post-Termination Damages
  • RSK06 Risk board, heat map and the Monte Carlo screen in The-SiteTeam
  • AIP-06 Draft reply: human approval and limits
  • TB-10 Final: termination day, 4 June 2015
Week 46
  • L45 Performance Bonds and Surety Intervention
  • RSK07 Case: USACE access shafts and a Norwegian sports hall — risk register and Monte Carlo from tender documents
  • AIP-07 Polishing the claim narrative
  • PBI-03 Project indicators as DAX measures
Week 47
  • L46 Final Account, Release and Reservation of Rights
  • AIP-08 Checking AI output with DCMA and the driving chain
  • PMP01 Exam structure, eligibility and a study plan
  • PBI-04 Dashboard design: executive, project manager, planner
Week 48
  • L47 Limitation, Time Bars and Claim Survival
  • AIP-09 Decision log and advance warning on site: report, decision, risk
  • PMP02 People: team, conflict and stakeholder management
  • PBI-05 Refresh, sharing and security
Week 49
  • L48 Adjudication, Arbitration and Litigation Strategy
  • PMP03 Process: scope, time and cost (CPM and EVM calculations)
  • PMP04 Risk, quality, procurement and contracts
Week 50
  • L49 Settlement, Mediation and Claim Cash Strategy
  • PMP05 Agile and hybrid approaches in construction (look-ahead, Last Planner-style methods)
  • PMP06 Business environment: governance, compliance, change and value
Week 51Capstone
  • L50 Capstone: Forensic Dossier, Expert Report and Hearing
  • PMP07 Mock exam strategy and 20 original sample questions
Week 52Final
  • Final exam and year review

Technical Office Engineering path · 108 hours

Contract, programme, updates, payments and change management, in the order a technical-office engineer meets them on a project. Existing lessons brought together, ending in a graded project on the EPC Petrochemical Project programme and a certificate.

1 · 16 hours

Contract and record basics

  • FDC01 The FIDIC family and risk allocation
  • FDC02 Parties, the Engineer's role and notice rules
  • L01 The DNA of a Claim
  • L03 Contract Map, Document Priority and Authority
  • SAH01 Why records? "No record, no event" in claims and payments
  • SAH02 The daily site report: weather, crews and plant, work done, obstructions, visitors
  • SAH03 Photo and evidence standards: date/location, before–after, naming
  • SAH04 Correspondence and notice discipline, reference numbers, deadlines
  • SAH05 Site forms and inspection: question types, records of inspection, document register
2 · 22 hours

Building the programme

  • PLN01 Work breakdown structure and activity definition (WBS, durations, calendars)
  • PLN02 Logic links, lag/lead and constraints
  • PLN03 Critical path and float (total/free)
  • PLN04 Resource- and cost-loaded baseline
  • PLN05 Programme quality check (DCMA 14-point logic)
  • PLN06 Importing an XER into The-SiteTeam, saving a baseline, submission and approval
  • PLN07 Case: an 18-month programme from a German school tender (GU)
  • L06 A Workable Baseline Programme
  • L07 Calendars, Logic and Milestones
  • L08 Total Float, Free Float and Milestones
3 · 16 hours

Updates and progress reporting

  • UPD01 Data date and the update cycle
  • UPD02 Progress measurement methods
  • UPD03 Actual dates, remaining duration and out-of-sequence progress
  • UPD04 Baseline versus current programme: detecting delay and the S-curve
  • UPD05 Structure of the monthly progress report
  • UPD06 Updating, the report screen and distribution in The-SiteTeam
  • UPD07 Case: a Smithsonian 2 MW solar design-build, from tender programme to monthly update
  • L19 Progress Measurement and Programme Updates
4 · 26 hours

Payments, cost and earned value

  • HKD01 Contract types and payment mechanisms
  • HKD02 Preparing an interim payment: measurement, stage percentages and deductions
  • HKD03 Price adjustment and escalation
  • HKD04 Change management and new unit rates
  • HKD05 Subcontractor payments, purchase orders and the final account
  • HKD06 Payments, cost visibility, procurement and subcontractor documents in The-SiteTeam
  • HKD07 Case: a Danish ABT18 technical building and a Dutch termijnstaat payment plan
  • EVM01 Budget, cost breakdown and control accounts
  • EVM02 PV, EV and AC
  • EVM03 Variances and indices (SV, CV, SPI, CPI)
  • EVM04 Forecasts (EAC methods, ETC, VAC, TCPI)
  • EVM05 Commitments, procurement and cash flow
  • EVM06 EVM, S-curve and cost visibility in The-SiteTeam
  • EVM07 Case: budget and earned value on a US federal design-build canopy job
  • FDC05 Payments: interim statements, payment certificates, retention
  • L23 Payment Notices, Set-Off and Retention
5 · 14 hours

Variations, notices and extension of time

  • FDC03 Programme, progress and the extension-of-time mechanism
  • FDC04 Variations, measurement and valuation
  • FDC06 Claims and disputes; tracking in The-SiteTeam
  • FDC07 Case: Europe's standard contracts versus FIDIC (NS 8407, ABT18, UAV-GC, YSE 1998, US FAR)
  • L15 Instructions, RFI Replies and Constructive Change
  • L16 Notice Regimes, Time Bars and Actual Knowledge
  • L17 Variation Valuation and Daywork
  • L18 Daily Records and Evidence Architecture
  • L20 Delay Events, Critical Path and EOT
6 · 14 hours

Final project: one month on the EPC Petrochemical Project programme

  • Prepare one monthly update, a payment application and an extension-of-time notice on the EPC Petrochemical Project programme; the instructor grades it.